ROAD AND TRAFFIC INDEX
Lemery, Batangas
LEMERY, BATANGAS
SURVEYED PAVEMENT DISTRESS IN FILIPINISMO STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
221
/S 1 13.8776301 120.9157529
Lateral Cracking 6 l.m 6 m 1.5 m 2 cm 3 13.8776973 120.9157365
Cemented 3 m 4 m 3 cm 8 13.878006 120.9155465
Mabini St/In 11 13.8779229 120.9155643
Chuck 1.26 sq. m 3 m 0.42 m 1 cm 14 13.8782354 120.9153902
15
Rizal St/In 24 13.8786199 120.9151093
Minor Worn out 558 sq. m 24
43
Small Pothole 0.1274 sq. m 0.26 m 0.49 m 3 cm 32 13.8788565 120.9149395
Edge break 1.44 sq. m 3 m 0.48 m 3.5 cm 42 13.8792492 120.9146669
Gen Luna St/In. 43 13.8792455 120.9147096
Minor Worn out 279 sq. m 44
53
Delamination 0.8474 sq. m 1.115 m 0.76 m 2 cm 53 13.879564 120.9144367
Block Crack 6.75 l.m 6.75 m 54 13.8797903 120.9143887
56.5
Extreme Worn out 27.9 sq. m 56 13.8797921 120.9143278
Faulting 5.22 sq. m 6 m 0.87 m 4 cm 57
Extreme Worn out 55.8 sq. m 57
58 13.8797545 120.9143452
Lateral Crack 6 l.m 6 m 0.1 m 1.5 cm 57 13.8798057 120.9143699
Extreme Worn out 27.9 sq. m 60
P. Burgos St/In. 60
Minor Worn out 418.5 sq. m 61
75
Bonifacio St/In 75 13.8805275 120.9139451
Edge Break & Extreme Worn out 9.9 sq. m 6 m 1.65 m 2 cm 76 13.8805807 120.9138771
Minor Worn out 446.4 sq. m 76
92
P. De Joya St/In 13.8811346 120.9134798
Blow Ups 5.0094 sq. m 2.53 m 1.98 m 3.5 cm 93 13.8812009 120.9134054
Edge Crack 3 l.m 3 m 0.48 m 3 cm
Corner Crack 0.85 l.m 0.85 m 0.89 m 4 cm
Rehabilitated Pavement 100 13.8811312 120.913143
108 13.8817473 120.9131556
Lakandula St/In 108 13.8817473 120.9131556
Major Worn Out 83.7 sq. m 109
111
Minor Worn Out 83.7 sq. m 117
119
Pot hole sq. m Noble St/In 119 13.8823835 120.9125951
Bow-shaped Depression 0.16 sq. m 0.40 m 0.40 m 3.5 cm #REF! 13.8823844 120.9127589
Minor Worn Out 976.5 sq. m 121 13.8823995 120.9126523
155
Corner Crack 3 l.m 3 m 0.18 cm 1.5 cm 121
Alligator Crack 2.6 l.m 2.6 m 1.42 m 4.5 cm 142 13.8831431 120.912212
Edge Crack 6 l.m 6 m 0.73 m 2 cm 153 13.8835308 120.9119069
Rajah Matanda St/In 155 13.8836053 120.9117956
Faulting 6 l.m 6 m 3.72 m 10 cm 157 13.883684 120.911773
Edge Crack 6 l.m 6 m 0.57 m 2 cm 173 13.884073 120.9115406
Traverse Crack 6 l.m 6 m 0.34 m 3 cm 187 13.8847773 120.9111293
190
Minor Worn Out 251.1 sq. m 192 13.8852927 120.9109265
200
Marasigan St/In 192 13.8847465 120.9111198
Corner Crack 1.75 l.m 1.75 m 0.1 m 2 cm 193 13.8849219 120.9110074
Edge Crack 6 l.m 6 m 0.57 m 2 cm 195 13.8849517 120.9109493
Rehabilitated Pavement 201 13.8852442 120.9108039
206 13.88529 120.9108
Minor Wornout 83.7 sq. m 207 - 209
P. Gomez St/In 208 13.8853679 120.9107276
Lateral Crack 3 l.m 3 m 0.5 m 1.5 cm 209 13.8857721 120.9104487
Major Worn Out 334.8 sq. m 210
221
Lateral Crack 6 l.m 6 m 0.165 m 1.5 cm 214 13.8860634 120.9102328
Bowl-shaped Depression 4.95 sq. m 3 m 1.65 m 2.7 cm 215 13.8858148 120.9103971
Lateral Crack 6 l.m 6 m 0.61 m 7.5 cm 216 13.8858812 120.9104218
Diagonal Crack 6 l.m 6 m 2.15 m 5 cm 217 13.8860186 120.9103224
Bowl-shaped Depression 1.74 sq. m 6 m 0.29 m 3.5 vm 218 13.8860711 120.910332
/E 221 13.8859473 120.9103377
Note: Legend: /S - Start
1. The data is surveyed last February 23, 2022. /E - End
2. The unit of measure l.m denotes linear meter. /In - Intersection
CONTACT US
GOVERNMENT DIRECTORY
Lemery Engineering Office,
Ilustre Ave., Lemery, Batangas
pmsgislemery@gmail.com